Simple Bathroom Update for a College Area Home

We recently worked with a couple in the San Diego State area who needed to update their bathroom… desperately. The arrangement of the vanity, toilet and shower couldn’t change because of the small square footage and location of key pipelines. But, you’ll surely agree everything inside had to go.

BEFORE

Bathroom remodel (before)

Work done:

  • Demoed and removed all components, tile, door, and finishings
  • Knocked out an unneeded arch over the shower that closed it in and made it feel dark
  • Replaced the hardie backer for a new, moisture resistant backing on the floors and inside the shower
  • Installed new recessed lighting
  • Tiled the floor and shower (adding a much-needed shampoo shelf)
  • Replaced and patched drywall
  • Resurfaced the walls
  • Painted
  • Installed the vanity and toilet
  • Hung a new door
  • Attached all finishes

AFTER

photo (4) Bathroom remodel - vanity

photo (2) photo (1)

All of their selections, including the tile and vanity, were in-stock at Home Depot making this a quick project.

They are very happy with the result and they know it will be a valuable selling point when they decide to put their house on the market.

Advertisements
This entry was posted in Bathrooms and tagged , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s